Last week Kainan and I made some progress on the studio/workshop space.
Kainan built some doors for the utility closet, hung them and started workiong on the door for the office space. I did the finishing on the doors (red stain and top-coat), and started building the overhead cabinets in the office and the cabinets for storing the Festool storage boxes. The electricians installed the receptacles for the Felder planer/joiner, Powermatic hollow-moriser and belt-sander, Nova drill press, and Laguna band-saw. Next we need to have the ventilation installed for the utility cabinet. We could definitely use some help. So if you have some time and want to build some stuff, please let me know. (I’ll buy lunch!)



Tagged architecture, CNC, community design, Industry City, woodwork